Methodology / no-recharge estimate
The Math, Visible.
Office loadAdd measured operating watts for the equipment used together.W
Raw energySelected watts × target hours. Divide by 1,000 to express kWh.Wh
System adjustmentDivide raw Wh by 0.90 assumed efficiency, then multiply by 1.20 for a planning margin.÷ ×
Capacity targetA planning threshold to compare with rated battery capacity, not a measured runtime guarantee.Wh
Example load = 60 + 30 + 20 + 10 = 120 W
Raw energy = 120 W × 4 h = 480 Wh
Battery target = 480 ÷ 0.90 × 1.20 = 640 Wh
1,024 Wh planning runtime = 1,024 × 0.90 ÷ 1.20 ÷ 120 = 6.40 h
The 90% efficiency and 20% margin are Zaron planning assumptions, not universal constants or manufacturer ratings. This model uses a constant selected load, a fully charged battery and no recharge. Low-load inverter losses, battery age and temperature can materially change actual runtime.